The 25mm thick large steel tube is driven with the finish shut by a steel shoe. On achieving the necessary driving resistance, an entire size cage is decreased in on the tube and filled with high slump concrete. The tube is then vibrated out leaving a shaft of concrete. From https://dicew959dpr4.ktwiki.com/user